The hospital is expected to be ready by the end of February, it will be equipped with respiratory triage, stabilization and hospitalization areas with a capacity of 100 beds, of which between 25 and 30 will be intensive therapy
The hospital is expected to be ready by the end of February, it will be equipped with respiratory triage, stabilization and hospitalization areas with a capacity of 100 beds, of which between 25 and 30 will be intensive therapy